Build Guide - Calibration
  1. Monitor NOTE 1 Output
  2. Set PITCHBEND (P532) to its minimum position
  3. Disconnect the TUNE knob at the PCB connector P402
  4. Set Dipswitch #4 to the ON position, all 5 LEDs should come on
  5. Adjust the SCALE trimmer (P401) to give a reading of 10.667V
  6. Return Dipswitch #4 to the OFF position
  7. Set the PITCHBEND (P532) to its maximum position
  8. Connect your meter to the PITCHBEND output (pin 1 of J531)
  9. Adjust the PITCH ZERO trimpot (P531) until you get a reading of 0.00V.
Email:  elby-designs@bigpond.com
© Copyright 2000. All rights reserved.     Revised: May 14, 2024