Build Guide - Calibration
  1. Set all controls to minimum
  2. Patch [SMOOTH CYCLE] to [SMOOTH IN]
  3. Monitor [SMOOTH OUT]
  4. Adjust P301 for 1.6kHz
  5. Patch [STEPPED CYCLE] to [STEPPED IN]
  6. Monitor [STEPPED OUT]
  7. Set P401 fully clockwise
  8. Adjust P401 until the frequency just starts to drop
  9. Install R409

Functional Test

  1. Patch [SMOOTH CYCLE] to [SMOOTH IN]
  2. Patch a 10Hz 5VDC square wave signal to [HOLD]
  3. Confirm that [SMOOTH OUT] is being cycled ON and OFF
  4. Patch [STEPPED CYCLE] to [STEPPED IN]
  5. Patch a 10Hz 5VDC square wave signal to [SAMPLE]
  6. Confirm that [STEPPED OUT] is generating STEPPED voltages

 

 

Email:  elby-designs@bigpond.com
© Copyright 2000. All rights reserved.     Revised: April 29, 2026