Build Guide - Calibration
Open JP1
Turn power on and wait for 1 minute
Set P202 to its mid-position
Monitor TP0 and TP90 on a dual-channel scope (set both traces to the same centre-point)
The frequency should be ~10Hz
Adjust P203 until the signal swings around 0.0V
Monitor TP90
Adjust P201 until the signal swings around 0.0V
Close JP1
Using [COARSE] and [FINE] set the frequency of the signals to 100Hz
Adjust P202 so that both signals have the same pk-pk value
Adjust P204 for an output level of 5Vpk-pk
Panel Wiring
Top Of Page
Email:
elby-designs@bigpond.com
© Copyright 2000. All rights reserved.
Revi
sed: May 6, 2026